Archway COMPETITOR 130 Schritt-für-Schritt-Anleitung

Blättern Sie online oder laden Sie pdf Schritt-für-Schritt-Anleitung für Baumaschinen Archway COMPETITOR 130 herunter. Archway COMPETITOR 130 12 Seiten. Standalone model

STEP-BY-STEP GUIDE
1. Using extendable arms wheel the power
pack into place about 1 metre away from
the borehole location.
3. Attach legs at all four corners of the rig
and secure with pins provided.
COMPETITOR 130 (Standalone model)
2. Position the slip bowl of the rig over the
borehole location.
4. Level the rig by screwing the feet onto
the load bearing plates. The mast must be
vertical for correct operation. Tools may
become stuck in borehole if mast is
inclined at an angle.