Cisco 5509 - Catalyst Chassis Switch Installationshandbuch - Seite 27
Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Cisco 5509 - Catalyst Chassis Switch herunter. Cisco 5509 - Catalyst Chassis Switch 34 Seiten. Wireless controller
Auch für Cisco 5509 - Catalyst Chassis Switch: Handbuch zur Schnellinstallation (17 seiten)
Verifying Interface Settings and Port Operation
Follow these steps to verify that your interface configurations have been set properly and the controller's
ports are operational.
Enter show interface summary. The controller's current interface configurations appear:
Step 1
Interface Name
--------------------------------
management
service-port
virtual
Step 2
Enter show port summary. The following information appears, showing the status of the controller's
distribution system ports, which serve as the data path between the controller and Cisco lightweight
access points and to which the controller's management interface is mapped.
Pr
-- ------- ---- ------- ---------- ---------- ------ ------- --------- -------
1
Normal
2
Normal
A link status of Up indicates that the controller's ports are fully operational.
Connecting the Network (Distribution System)
Up to eight of the following SFP modules can be installed in any combination:
•
•
•
Depending on the distribution system physical port to be assigned, use Ethernet Category 5 or higher
cables or SX/LX/LH compatible fiber-optic cables to connect the network equipment to the controller.
78-18998-01
STP
Admin
Physical
Type
Stat
Mode
Forw Enable
Auto
Forw Enable
Auto
GLC-SX-MM (1000BASE-SX) SFP modules that provide a 1000 Mb/s wired connection to a
network through an 850nM (SX) fiber-optic link using an LC physical connector.
GLC-LH-SM (1000BASE-LX) SFP modules that provide a 1000 Mb/s wired connection to a
network through a 1300nM (LX/LH) fiber-optic link using an LC physical connector.
SFP-GE-T (1000BASE-T) SFP modules that provide a 1000 Mb/s wired connection to a network
through a copper link using an RJ-45 physical connector.
Port
Vlan Id
----
--------
LAG
untagged
N/A
N/A
N/A
N/A
Physical
Link
Mode
Status
Status
1000 Full
Up
1000 Full
Up
Cisco 5500 Series Wireless Controller Installation Guide
Using the Startup Wizard
IP Address
Type
--------------
-------
10.91.104.93
Static
10.10.0.9
Static
1.1.1.1
Static
Link
Mcast
Trap
Appliance
Enable
Enable
N/A
Enable
Enable
N/A
Ap Mgr
Guest
------- -----
Yes
No
No
No
No
No
POE
27