Cisco Catalyst 2960-S Series Installationshandbuch - Seite 17

Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Cisco Catalyst 2960-S Series herunter. Cisco Catalyst 2960-S Series 27 Seiten. Switch getting
Auch für Cisco Catalyst 2960-S Series: Datenblatt (28 seiten), Gestartet Handbuch (31 seiten)

Cisco Catalyst 2960-S Series Installationshandbuch
Chapter 1
Switch Installation
Table- or Shelf-Mounting
To install the switch on a table or shelf, locate the adhesive strip with the rubber feet in the mounting-kit
envelope. Attach the four rubber feet to the recessed areas on the bottom of the chassis. Place the switch
on the table or shelf near an AC power source.
When you complete the switch installation, see the
information on switch configuration.

After Switch Installation

Connecting the FlexStack Cables

Always use a Cisco-approved FlexStack cable to connect the switches.
Connect only Catalyst 2960-S switches in a switch stack.
Note
Remove the dust covers from the FlexStack cables, and store them for future use.
Step 1
Figure 1-17
OL-19732-04
Configure the switch by running Express Setup to enter the initial switch configuration. See the
switch getting started guide in the
Use the CLI setup program to enter the initial switch configuration. See
the Switch with the CLI-Based Setup Program."
Connect to the stack ports. See the
Install the power cord retainer (optional). See the
section on page
1-18.
Connect to the front-panel ports. See the
the
"10/100 and 10/100/1000 PoE+ Port Connections" section on page
10/100/1000 Port Connections" section on page
Connect the FlexStack Cables
"After Switch Installation" section on page 1-17
"Related Publications"
section.
"Connecting the FlexStack Cables" section on page
"Installing the Power Cord Retainer (Optional)"
"Installing SFP and SFP+ Modules" section on page
1-26.
Catalyst 2960-S Switch Hardware Installation Guide
Connecting the FlexStack Cables
Appendix 1, "Configuring
1-17.
1-20,
1-24, and the
"10/100 and
1-17
for