Shimano SG-8C20 Service-Handbuch - Seite 16

Blättern Sie online oder laden Sie pdf Service-Handbuch für Industrielle Ausrüstung Shimano SG-8C20 herunter. Shimano SG-8C20 36 Seiten. Inter-8 coaster hub
Auch für Shimano SG-8C20: Anleitung für den technischen Service (4 seiten)

Shimano SG-8C20 Service-Handbuch

Disassembly of the internal unit

1.
Remove the brake shoe unit.
2.
Carefully remove the stop ring
with a screwdriver. Because
the stop ring will tend to
come off with some force,
use a piece of cloth to prevent
loss.
3.
Remove carrier unit and ring
gear by lifting straight up.
Do not rotate to disengage.
4.
Remove the ring gear slide
spring with a screwdriver.
Ring gear slide spring
16
(Y-35P 12000)
Brake shoe unit
Screwdriver
Stop ring
(Y-33Y 19000)
Carrier unit (Y-35P 98040)
Ring gear slide spring (Y-35P 12000)
Ring gear 1
(Y-35P 11000)