DIGITAL DELAY Elite RPM Handbuch - Seite 5

Blättern Sie online oder laden Sie pdf Handbuch für Schalter DIGITAL DELAY Elite RPM herunter. DIGITAL DELAY Elite RPM 5 Seiten.

To test the shift output, with the engine off, hold down either of the change number buttons. Keep in mind
the Ign. input needs to be enabled. After about two seconds the Shift output will activate and stay activated until the
change number button is released. This is a good way to test the Shift output, the wiring to the solenoid, and the shift
solenoid operation.
2036 Fillmore Street, Davenport, Ia. 52804
563-324-1046
Shift Output Test
Wiring
5
www.racedigitaldelay.com