Digital Equipment DECserver 700 Hardware-Installationskarte - Seite 12
Blättern Sie online oder laden Sie pdf Hardware-Installationskarte für Server Digital Equipment DECserver 700 herunter. Digital Equipment DECserver 700 13 Seiten.
Verify Server Is Operating Correctly
When you plug in the power cable, the server
runs tests. After the tests are completed, the
server requests a down-line load of software.
The 7-segment display alternates between 3
and 4 until the software is loaded. Allow 3
minutes for the server to complete the proce-
dure.
Compare the 7-segment display and the Sys-
tem OK LED status to the table on page 12.
System
OK LED
11
7-Segment
display
LKG-5828-91l