Siemens Simatic ET200pro Handbuch - Seite 14
Blättern Sie online oder laden Sie pdf Handbuch für Industrielle Ausrüstung Siemens Simatic ET200pro herunter. Siemens Simatic ET200pro 29 Seiten. Migration
Auch für Siemens Simatic ET200pro: Handbuch (26 seiten), Betriebsanleitung (8 seiten), Informationen zum Produkt (2 seiten)
Product overview
2.2 Functions
Port configuration
You can use an electronic module EM 4 IO-Link HF as of firmware version V1.1 to
commission the IO-Link ports of the IO-Link master or the connected IO-Link devices in two
different ways:
● Port configuration without S7-PCT
● Port configuration with S7-PCT
Port configuration without S7-PCT
Requirements
You have selected the "Port configuration without S7-PCT" check box in the configuration of
the IO-Link master in STEP 7.
Procedure
You configure the IO-Link master directly in STEP 7:
● Configure the I/O data lengths for each port
● Optional: Activate the PortQualifierInformation (PQI)
● Port mode:
– Operation in "IO-Link autostart" mode (default)
– Operation in "IO-Link manual" mode
– Operation as DI
– Operation as DQ
– Disabled
Port configuration with S7-PCT
Requirements
You have cleared the "Port configuration without S7-PCT" check box in the configuration of
the IO-Link master in STEP 7.
Procedure
You configure the IO-Link master with the Port Configuration Tool S7-PCT, V3.2 or higher.
14
IO-Link Master (6ES7147-4JD00-0AB0)
Manual, 03/2018, A5E37967003-AB