Contents
5
Installing an S7-300
5.1
Installing the Rail
5.2
Module Accessories
5.3
Installing the Modules on the Rail
5.4
Identifying the Modules with Slot Numbers
6
Wiring an S7-300
6.1
Wiring Rules
6.2
Wiring the Power Supply Module and CPU
6.3
Setting the Power Supply Voltage Selector Switch
6.4
Wiring the Front Connectors of the Signal Modules
6.5
Connecting Shielded Cables Using the Shield Connecting Element
7
Configuring an MPI or PROFIBUS Subnet
7.1
Configuring a Subnet
7.1.1
Basic Principles
Special Considerations for CPs and FMs
7.1.2
Rules for Configuring a Subnet
7.1.3
Cable Lengths
7.2
Network Components
7.2.1
PROFIBUS Bus Cable
7.2.2
Bus Connectors
7.2.3
Plugging the Bus Connector into a Module
7.2.4
RS 485 Repeater
8
Preparing an S7-300 for Operation and Start-up of PROFIBUS-DP
8.1
Plugging in the Memory Card (Not CPU 312 IFM/314 IFM)
8.2
Inserting the Backup Battery/Rechargeable Battery (Not CPU 312 IFM)
8.3
Connecting a Programming Device
8.3.1
Connecting a Programming Device to an S7-300
8.3.2
Connecting a Programming Device to Several Nodes
8.3.3
Connecting a Programming Device to Ungrounded Nodes of an
MPI Subnet
8.4
Resetting the CPU Memory
8.5
PROFIBUS-DP Startup
8.5.1
Startup of the CPU 315-2 DP as a DP Master
8.5.2
Startup of the CPU 315-2 DP as a DP Slave
9
Changing the Backup Battery/Rechargable Battery, Module and Fuses
9.1
Changing the Backup/Rechargeable Battery (not CPU 312 IFM)
9.2
Replacing Modules
9.3
Replacing Fuses on 120/230 VAC Digital Output Modules
x
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . .
S7-300, Installation and Hardware
EWA 4NEB 710 6078-02a
5-2
5-5
5-6
5-9
6-2
6-3
6-5
6-6
. . . . .
6-10
7-2
7-3
7-5
7-7
7-14
7-18
7-19
7-21
7-22
7-23
8-2
.
8-4
8-6
8-7
8-8
8-10
8-11
8-14
8-15
8-16
. . . . . . .
9-2
9-4
9-8