Mechanical installation
Note
When lifting the SITRANS WW310 Weighfeeder, connect to the lifting points at the legs of
the unit, and follow local governing code for lifting/hoisting.
Perform a thorough and systematic inspection of containers immediately upon receipt of your
Siemens weighfeeder. The containers are packed to separate each item and provide protection
during shipping.
Note
Do not remove equipment from shipping crates or boxes until you check for possible
shipping damage. Contact the carrier immediately if damage is noted.
Your weighfeeder has been designed, assembled, and factory tested for your specific
application.
Note
• The frame of the weighfeeder needs to be grounded to ensure accurate signal processing
• Do NOT remove the tagged load cell shipping bolt(s) until the installation is complete to
• Do NOT weld on or near the weighfeeder while the load cell is connected to the electronic
• Follow a scheduled, preventative maintenance program to ensure optimum performance
SITRANS WW310
Operating Instructions, 03/2014, A5E33490433-AA
to the integrator.
prevent load cell damage.
integrator. Damage to the integrator may result if the load cell is not disconnected from
the integrator.
and long equipment life.