Siemens SIVACON Installationshandbuch - Seite 15
Blättern Sie online oder laden Sie pdf Installationshandbuch für Industrielle Ausrüstung Siemens SIVACON herunter. Siemens SIVACON 34 Seiten. Distribution systems installation and maintenance instructions for power factor correction (pfc) capacitors
3.4
Grounding
The M12/M8 bottom stud is used for grounding. Connect it to the ground by cable, or connect
the capacitor to any other conductive item which is connected to the ground.
Note
Connect the capacitor case to ground.
Suitable connectors have to penetrate existing layers of lacquer to ensure good, constant
conductivity and sufficient current carrying capabilities.
If grounding is done via the metal chassis the capacitor is mounted to, then the layer of varnish
beneath the washer and nut should be removed.
Installation and maintenance instructions for Power Factor Correction (PFC) capacitors
Installation Manual, 05/2022, L1V30884033A
Mounting
3.4 Grounding
15