Cisco N540-FH-CSR-SYS Vorbereiten der Installation - Seite 3
Blättern Sie online oder laden Sie pdf Vorbereiten der Installation für Netzwerk-Router Cisco N540-FH-CSR-SYS herunter. Cisco N540-FH-CSR-SYS 14 Seiten.
Auch für Cisco N540-FH-CSR-SYS: Handbuch installieren (43 seiten)
![Cisco N540-FH-CSR-SYS Vorbereiten der Installation](/uploads/products/server2/554928/554928.jpg)
Prepare for Installation
Airflow for Site Planning
For site planning, the Maximum System Airflow at maximum system temperature is 90.0CFM for
N540-FH-CSR-SYS and 125.0CFM for N540-FH-AGG-SYS.
Airflow Guidelines
Cool air is circulated through the router by fans that are located along the rear side of the router. The internal
fans maintain acceptable operating temperatures for the internal components by drawing in cool air through
the vents, and circulating the air through the router.
To ensure adequate airflow, we recommended that you always maintain this minimum clearance distance for
N540-FH-CSR-SYS:
• Front clearance—5 inches (12.7 centimeters)
• Rear clearance—2 inches (5.08 centimeters)
To ensure adequate airflow, we recommended that you always maintain this minimum clearance distance for
N540-FH-AGG-SYS:
• Front clearance—5 inches (12.7 centimeters)
• Rear clearance—6.0 inches (15.24 centimeters)
Airflow for Site Planning
Prepare for Installation
3