Cisco Catalyst 9130 Handbuch - Seite 18

Blättern Sie online oder laden Sie pdf Handbuch für Drahtloser Zugangspunkt Cisco Catalyst 9130 herunter. Cisco Catalyst 9130 26 Seiten.

Grounding the Antenna

Procedure
Step 1
Determine the mounting location for the antenna on the pole or mast.
Step 2
Position and mount the mounting flange bracket onto the pole or mast using the hose clamps provided in the
kit.
The hose clamps should pass through the slots on the free mounting flange bracket.
Step 3
Tighten the hose clamps and set screws until the antenna is fully secure on the mast.
Then, adjust the antenna to its final position. Then, use a slotted screwdriver to tighten the screws on the hose
clamps.
Step 4
Attach the other mount flange through the holes in the bracket to the back of the antenna using four M8 screws.
The mounting kit includes the mounting flange and M8 screws. Tighten the screws to 20.0 +/- 1.0 Nm torque.
Step 5
Assemble the mounting arm to the flanges.
Use a wrench to tighten all screws and nuts.
Step 6
Ensure that the antenna cannot rotate about the mast.
Step 7
Adjust the azimuth (side-to-side position) and the antenna's elevation (up-and-down position).
Loosen the adjustment pivot nuts slightly to allow for adjustment.
You can use the azimuth and elevation markings on the articulating mounting arm and the flange brackets as
a guide. See
can adjust the azimuth angle up to ±50 degrees, see
up to ±50 degrees see
Step 8
After adjusting the antenna position, tighten all nuts at the pivot points to 25.0 +/- 1.0 Nm torque.
Step 9
Connect the Ethernet cable to the antenna using the termination kit.
Grounding the Antenna
The antenna must be grounded before connecting power.
Procedure
Step 1
Install grounding standoff included in the solar shield kit when the optional solar cover is used.
Use the included Electrical Joint Compound on both ends of grounding standoff and tighten the standoff to
10.2 +/- 1.0 kgf-cm of torque.
Step 2
Connect the antenna to building ground with the included ground screw and included Electrical Joint Compound.
Tighten the ground screw to 10.2 +/- 1.0 kgf-cm of torque.
Introduction to Cisco Catalyst 9130 Access Point with 9104 Stadium Antenna
18
Figure 19: Close-Up View of the Azimuth and Elevation-Adjustment Pivots, on page
Figure 21: Elevation Adjustment, on page
Introduction to Cisco Catalyst 9130 Access Point with 9104 Stadium Antenna
Figure 20: Azimuth Adjustment, on page
16.
15. You
15, and elevation