Argo ORION PLUS Betriebsanleitung - Seite 8
Blättern Sie online oder laden Sie pdf Betriebsanleitung für Klimagerät Argo ORION PLUS herunter. Argo ORION PLUS 18 Seiten. Portable air conditioner (local)
Auch für Argo ORION PLUS: Betriebsanleitung (16 seiten)
The unit must be placed vertically for 2 hours before the first power on.
Open the packaging and remove the box from above. Remove the product and the other elements supplied
(illustrated in the box below).
LCD remote control
Round fitting for window (1) to be
positioned between the end of the
tube and the end fitting for the
window
End fitting for window (2)
Window unit kit (A+B)
Position the product vertically on a flat and stable surface, as close as possible to a window and at least 50 cm from walls
or other nearby obstacles.
USE WITH END FITTING FOR WINDOW
V 01/19
APPLIANCE START-UP
Type AAA batteries
for the remote control
(not included)
Hose
Drainage pipe.
Window unit (A)
Cap (B)
25