Cisco Catalyst 8510 Installationshandbuch - Seite 2

Blättern Sie online oder laden Sie pdf Installationshandbuch für Netzwerk-Hardware Cisco Catalyst 8510 herunter. Cisco Catalyst 8510 19 Seiten. Installing and grounding the chassis
Auch für Cisco Catalyst 8510: Kurzreferenz (8 seiten)

Installing and Grounding the Chassis
WARNING: Before you install, operate, or service the system, read
the Site Preparation and Safety Guide. This guide contains
important safety information you should know before working with
the system.
Installing the Rack
WARNING: Three people are required to lift the chassis. To prevent
damage to the chassis and components, never attempt to lift the
chassis by the handles on the power supplies or on the interface
modules, or by the plastic panels on the front of the chassis.

Installing the Chassis in a Rack

0
100 Base Fx
FAST ETHERNET MODULE
1
2
3
4
Attaching the Brackets and Guides
Cable guide
0
100 Base Fx
FAST ETHERNET MODULE
1
2
3
4
17.25"
(43.82 cm)

Grounding the System

0
100 Base Fx
FAST ETHERNET MODULE
1
2
3
4
Grounding lug
Screws (M4)
L bracket
10.36"
(26.31 cm)
18.40"
(46.74 cm)
Grounding
pad
Wire