Cisco UCS X10c Installations- und Wartungshandbuch - Seite 13
Blättern Sie online oder laden Sie pdf Installations- und Wartungshandbuch für Netzwerk-Hardware Cisco UCS X10c herunter. Cisco UCS X10c 38 Seiten. Front mezzanine gpu module
Installing the GPU Module
This chapter contains the following topics:
•
•
Installing and Removing the GPU Module
The front mezzanine module installs into the front mezzanine slot of Cisco UCS X-Series compute nodes.
•
•
•
Required Equipment
Cisco provides a kit (UCSX-X10C-GPUFM) for installing the Cisco UCS X10c front mezzanine GPU module.
The kit contains the following:
• Required GPU cables
• The front mezzanine cage including:
To provide flexibility for your deployment, the U.2 drives and GPUs are orderable separately. However, if
you order the Cisco UCS X10c front mezzanine GPU module with one GPU, the unused GPU slot is
pre-populated with a filler module. You can purchase additional filler modules from Cisco.
Installing and Removing the GPU Module, on page 5
Front Mezzanine GPU Module Configuration, on page 10
Required Equipment, on page 5
Removing the Front Mezzanine GPU Module, on page 6
Installing the Front Mezzanine GPU Module, on page 8
• The storage cage which supports a maximum of two U.2 drives
• The GPU cage which supports a maximum of two Cisco T4 GPUs (UCSX-GPU-T4-MEZZ).
Note
If you order the Cisco UCS X10c front mezzanine GPU module with one GPU,
the unused GPU slot is pre-populated with a filler module. You can purchase
additional filler modules from Cisco
Cisco UCS X10c Front Mezzanine GPU Module Installation and Service Guide
2
C H A P T E R
5