Cisco UCS B22 M3 Installations- und Wartungshinweise - Seite 16
Blättern Sie online oder laden Sie pdf Installations- und Wartungshinweise für Server Cisco UCS B22 M3 herunter. Cisco UCS B22 M3 31 Seiten. Blade server
Auch für Cisco UCS B22 M3: Upgrade-Handbuch (21 seiten)

b) Press the button/handle on the tool to grasp the installed CPU.
c) Lift the tool and CPU straight up.
Figure 11: Proper Alignment of CPU Pick and Place Tool (for Intel Xeon E5-2400 Series Processors)
1
Alignment mark on the button/handle
Installing a New CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
• The CPU is supported for that given server model. This may be verified via the server's Technical Specifications ordering guides
or by the relevant release of the Cisco UCS Capability Catalog.
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in UCS Manager will recognize and
allow the new CPU.
16
2
Socket alignment mark