Cisco UCS B260 M4 Installations- und Wartungshinweise - Seite 28

Blättern Sie online oder laden Sie pdf Installations- und Wartungshinweise für Server Cisco UCS B260 M4 herunter. Cisco UCS B260 M4 46 Seiten. Blade server
Auch für Cisco UCS B260 M4: Installations- und Wartungshinweise (50 seiten)

Cisco UCS B260 M4 Installations- und Wartungshinweise

Removing a CPU and Heat Sink

1
If DIMM insertion errors are detected, they may cause the blade discovery process to fail and errors will be
reported in the server POST information, which is viewable using the UCS Manager GUI or CLI. DIMMs
must be populated according to specific rules. The rules depend on the blade server model. Refer to the
documentation for a specific blade server for those rules.
Faults on the DIMMs or rear mezzanine modules also cause the server health LED to light solid amber for
minor error conditions or blinking amber for critical error conditions.

Removing a CPU and Heat Sink

Use the following procedures to remove, replace, or upgrade a CPU.
Procedure
Step 1
Remove any SSDs or blanking panels by squeezing the slide latch and pulling outward. See callout 1 in the
following figure.
Step 2
Unscrew one captive screw on each SSD cage. See callout 2.
Step 3
Slide the SSD cage back and upward to fully remove it. See callout 3.
Step 4
Place the SSD cages next to the sides of the base, keeping all cables connected. See callout 4.
Figure 11: Removing an SSD Cage
Step 5
Unscrew the four heat sink captive screws in the order shown in the following figure.
Note
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v4 CPUs
20
LED diagnostics button on the server motherboard
There and left and right versions of the heat sinks and CPUs. The left heat sink, shown in the following
figure, is for CPU1 and the right heat sink, shown in the following figure, is for CPU 2.
Servicing the Blade Server