CRRC MS-ZD20 Gebrauchsanweisung - Seite 7

Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Werkzeuge CRRC MS-ZD20 herunter. CRRC MS-ZD20 13 Seiten. Electric installation tool

3. Operation

3.1 Before Startup

a. Inspect the connection of moving parts.
b. Inspect the connection of pintail collector.
c. Inspect the battery.

3.2 Assembly of Electric Tool

STEP1: Thread the nut sleeve into front of cylinder until the end.
STEP2: Push the sensor to cylinder; thread the nut sleeve at anti-clockwise to
sensor; tighten 4 set screws from nut sleeve to sensor.
STEP3: Thread collect assembly into cylinder.
STEP4: Thread anvil socket into collect assembly.
STEP5: Insert jaw into anvil, then thread jaw into sensor and anvil socket.
STEP6: Install pintail collector to rear of cylinder.
STEP7: Install battery.
STEP8: Adjust the riveting force: Set the riveting force to 5 kN by the buttons
under the LCD display, and then lock down the force.
Lock
Up
Notes of Reset/lamp switch:
a. the lamp can be turned on only when force is locked;
b. Depress the Reset/lamp switch for 3 to 5 seconds to reset the tool.
Reset/lamp switch
Down
5