AEONS Technologies SP 09 Series Benutzerhandbuch - Seite 5

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Gehege AEONS Technologies SP 09 Series herunter. AEONS Technologies SP 09 Series 12 Seiten. Wall-mounted enclosure

Step 2
: Install Top Panel and Frames
Place the Top Panel (#1) on a flat surface. Turn the assembly
over and insert it into the top panel. Ensure that the Top and
Bottom Panels (#1 and #9) are oriented in the same direction.
Secure with 8x M8 Hexagon Screws and 8x M8 Flange Nuts
from bottom, and 2x M4 self-tapping screws from front.
4