Aeotec Dual Nano Switch ZW140 Benutzerhandbuch - Seite 9
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Schalter Aeotec Dual Nano Switch ZW140 herunter. Aeotec Dual Nano Switch ZW140 15 Seiten.
8-7-2019
Note: This is the physical connection diagram for 120/230VAC power input.
1. Mounting the gang box.
2. Position all wires to provide room for the device. Place the Dual Nano Switch inside the gang box towards the back of the box.
3. Position the antenna towards the back of the box, away from all other wiring.
4. Reinstall the Dual Nano Switch to the gang box.
5. Reinstall the cover onto the gang box.
Note: 1. The gang box should be sized 3×2×2.75 inch / 75×50×70 mm or larger, minimum volume 14 in / 230cm .
2. Use flexible copper conductors only.
5. Restore Power.
Restore power at the circuit breaker or fuse.
https://aeotec.freshdesk.com/support/solutions/articles/6000178928-dual-nano-switch-user-guide-zw132-and-zw140-
Dual Nano Switch user guide : Aeotec Group
9/15