Clarke Strong-Arm GC0915 Handbuch für Betrieb und Wartung - Seite 6

Blättern Sie online oder laden Sie pdf Handbuch für Betrieb und Wartung für Elektrowerkzeug Clarke Strong-Arm GC0915 herunter. Clarke Strong-Arm GC0915 17 Seiten. 10 tonne hydraulic bench press

Clarke Strong-Arm GC0915 Handbuch für Betrieb und Wartung
6. Attach the pump assembly to the
frame using the fixing bolts and
washers. Fit one bolt first to bear
the weight and use the
adjustment provided by the
upper bolt.
• The pump can be installed on
either side of the frame but will
usually be assembled for a right-
handed press operator.
7. Screw the pump handle into the
pump actuating lever.
8. Unscrew the air bleed valve and
check that the pump is filled with
hydraulic oil up to a visible level.
• If empty, the total capacity is 630ml.
9. If obtained, bolt the mandrel
storage bracket to the side of the
frame using the bolts supplied.
10. Store the mandrels (if obtained)
including the adaptor, in their
positions on the bracket.
11. Insert the bed support pins into
the holes in the columns at the
required position. Then set the
bed frame in position on the pins.
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
6