Zanussi ZHC 95 ALU Gebrauchsanweisung - Seite 16
Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Lüftungshaube Zanussi ZHC 95 ALU herunter. Zanussi ZHC 95 ALU 20 Seiten. Cooker hood
Auch für Zanussi ZHC 95 ALU: Gebrauchsanweisung (20 seiten), Gebrauchsanweisung (18 seiten)
Drilling the shelves:
a) Using the cardboard template provided, and
taking hole "B "as a point of reference, drill the
shelves along the central axis to allow the
passage of the chimney.
The chimney must be inserted into the shelves
before it is fixed to the hood canopy C.
b) When installing the re-circulation version with
the air outlet directed upwards, if the fan unit
is positioned below the line of shelves it will be
necessary to drill a suitable hole in the top shelf
only, to allow the air ducting pipe to pass
through.
Direction and position of the ducting fan
unit
a) The hood is normally supplied with the air outlet
directed towards the wall, if it is to be installed
with the air outlet directed to the right or left, it
will be necessary to change the direction of the
ducting fan unit, proceeding as follows:
- Unscrew the screws U;
- Turn the ducting fan unit 60 ° to the right or
left;
- Replace the screws U.
b) The ducting fan unit air outlets must be
arranged according to the type of installation
to be carried out.
· Air outlet directed upwards (re-circulation only)
- Remove the plastic plug from the upper part of
the venting grill and replace it on the rear part.
· Air outlet directed towards the wall.
- Remove the plastic frame from the air outlet.
INSTALLATION INSTRUCTIONS
16
S36_12
S36_13
U
U
A08_14