Zanussi ZHC 950 Gebrauchsanweisung - Seite 14

Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Lüftungshaube Zanussi ZHC 950 herunter. Zanussi ZHC 950 21 Seiten. Zhc 950
Auch für Zanussi ZHC 950: Handbuch für Installation und Gebrauch (10 seiten)

Fitting the Wall Brackets

Draw a vertical line on the wall, from the
centre of the cooking appliance up to the
ceiling, or as high as is practical using a
spirit level and mark pen. This is to
ensure the correct vertical alignment of
the appliance.
Draw a horizontal line through the
vertical at 650mm above the hob.
Place the first bracket item 7.2.1 on the
wall 1 or 2mm from the ceiling or the
upper limit as shown aligning the notch in
the centre with the vertical line.
Mark the wall bracket hole centres on
the wall ready for drilling.
Place the second bracket item 7.2.1 on
the wall at X below the first bracket as
shown aligning the notch in the centre
with the vertical line.
(X is determined by the height of the
upper chimney supplied).
Mark the wall bracket hole centres on
the wall ready for drilling.
Draw a horizontal line through the
vertical at 306mm above the hob and
mark two hole centres at 116mm either
side of the vetical line.
Drill the holes for the fixing screws using
an 8mm masonry drill and insert the 6
rawl plugs item 11.
Fix the lower bracket item 7.2.1 using
two 4.2x44.4 wall fixing screws item
12a.
Fix the upper fixing bracket item 7.2.1
and the recirulation outlet support item
7.3 together using two 4.2x44.4mm
wall fixing screws item 12a as
illustrated.
Insert two 4.2x44.4mm wall fixing
screws item 12a into the two holes
116mm either side of the vertical line
and tighten leaving a space between
the underside of the screwhead and
the wall of 5-6mm.
Note: If the hood is to be
installed onto a hollow
construction or plaster or
partition board wall then special
fixing screws will be required
(not supplied).
12