Acorn Neo-Metro WEDGE WSW390 Handbuch für Installation, Betrieb und Wartung - Seite 7

Blättern Sie online oder laden Sie pdf Handbuch für Installation, Betrieb und Wartung für Sanitärprodukt Acorn Neo-Metro WEDGE WSW390 herunter. Acorn Neo-Metro WEDGE WSW390 11 Seiten.

Acorn Neo-Metro WEDGE WSW390 Handbuch für Installation, Betrieb und Wartung
FIXTURE ANCHORING
Locate and mount the Mounting Bracket to a finished wall. Anchoring
1
Hardware is provided by installer to suit wall conditions.
NOTE: It may be helpful to install to the deck,
faucets, soap dispensers or other accessories prior
to wall mounting. Refer to installation details
provided with accessories.
1
Basin
2
P-Trap Enclosure's Mounting Frame
3
#10-32 x 1/2" Screws
4
Stainless Steel Locknuts (Provided)
Hang Basin Assembly against finished wall, and slide down wall
3
until the Deck Mounting Channel Rests on Mounting Bracket.
4
NOTE: It is recommended to confirm
the level of the hanging Basin Assembly
before marking and pre-drilling the
mounting holes.
1
Finished Wall
2
Basin Assembly
3
Installer Provided 1/4" Anchoring Hardware
4
P-Trap Enclosure Mounting Frame
Part #: 5914-000-001
2
3
(Provided)
2
1
3
DETAIL B
INSTALLATION, OPERATION
& MAINTENANCE MANUAL
IMPORTANT: Industry standard wall backing for wall
hung fictures is required. Installer provided wall
anchors and wall anchoring hardware must be
appropriate for wall construction and have a minimum
pull-out rating of 1000lbs (454kg).
1
1
Finished Wall
2
"S" Clip Mounting Bracket
3
Installer Provided 1/4" Anchoring Hardware
Attach P-Trap Enclosure's Mounting Frame to Basin using
2
#10-32 x 1/2" Screws.
DETAIL A
NOTE: Single station unit shown; the two,
three and four station units will differ. Refer to
rough-in sheets for additional information.
1
B
Finished Wall
2
Deck Mounting Channel
3
Basin Assembly
4
"S" Clip Mounting Bracket
Secure Basin Assembly to finished wall using installer provided
4
1/4" Wall Anchors and Anchoring Hardware.
2
3
TOLL FREE 800-743-8259 • LOCAL 626-855-4866 • FAX 626-855-4863
Page 7 of 11
4
3
A
NEO-METRO FIELD SERVICE
Date: 04/12/21
1
2
1
4