Acorn Engineering SFST-T-OT-CWB-ITG Anweisungen für Installation, Betrieb und Wartung - Seite 5
Blättern Sie online oder laden Sie pdf Anweisungen für Installation, Betrieb und Wartung für Kontrolleinheit Acorn Engineering SFST-T-OT-CWB-ITG herunter. Acorn Engineering SFST-T-OT-CWB-ITG 8 Seiten. Sfst series thermostatic mixing valve supply fixture
INSTALLATION:
1. Locate mixing valve fixture in a suitable place
accessible for servicing and adjusting. Valve
fixture should be as close as possible to point
of use.
2. Thoroughly flush supplies.
3. Connect Hot and Cold supplies to mixing valve
inlets and outlet to fixture(s). Valve fixture
connections are 1/2" NCT, for supply lines
by others.
4. Turn on supplies and inspect for leaks. Tighten
connections if leak(s) are detected.
5. Turn on fixture and allow to run until water
temperature stabilizes. Measure water
temperature. If water is not at desired
temperature adjust as needed, (refer to
adjustment section below). Maximum
recommended outlet temperature is 115°F
(46°C).
TEMPERATURE ADJUSTMENT:
1. Loosen locknut. Detail A
2. Turn on fixture so temperature can stabilize.
3. Using 1/4" allen wrench turn adjustment stem
counter-clockwise for hotter or clockwise for
colder outlet temperature. Detail B
4. Tighten locknut to prevent any unauthorized
or accidental temperature adjustment.
5. Re-check temperature.
LOCKNUT
DETAIL A
Acorn Controls
Division of Acorn Engineering Company
Manual #7802-117-000
5/8" WRENCH
®
SFST Installation & Operation Manual
INSTALLER
PROVIDED
1/2" NCT RISER,
SUPPLIES AND
CONNECTIONS
ADJUSTMENT
STEM
, A member of Morris Group International
TYPICAL INSTALLATION
1/8" ALLEN
WRENCH
DETAIL B
™
Page 5 of 8
Date: 09/22/17