Armstrong response 2000 Installations- und Betriebsanleitung - Seite 4

Blättern Sie online oder laden Sie pdf Installations- und Betriebsanleitung für Warmwasserbereiter Armstrong response 2000 herunter. Armstrong response 2000 4 Seiten. Instantaneous hot water unit

10.
The plate pack is re-tightened by tightening the
clamping bolts. Care should be taken to ensure
that these clamps are tightened as uniformly as
possible, i.e. the frame plates will be parallel as
possible when tightening. Avoid end plate
skewing greater than 10mm. These clamps
should be tightened until the correct 'A'
dimension is achieved. (See Fig. 1 for details)
'A' for 032 plates = total number of plates x 2.9mm
'A' for 150 plates = total number of plates x 2.5mm
The following information is required when ordering
spare plates and gaskets.
1.
The equipment serial number and model type.
2.
The quantity and type of plates (number of port
holes and position).
3.
The quantity and type of gaskets (A, B or D
gaskets).
Electrical
The Response? control system is designed to operate
for long periods with only the following checks.
At 6 monthly intervals check:-
1.
The pump/s are running smoothly and are not
noisy or vibrating.
2.
The pump seals are not leaking.
3.
The electrical installation thoroughly for defects.
Ensure that the earth connections are making
good contact and all terminal screws are tight.
4.
The valve actuator is running smoothly and not
noisy.
Spares & Service
Only replace parts with original Armstrong
ATTN
Holden Brooke Pullen spares.