Blagdon inpond 5 in 1 6000 Handbuch - Seite 12
Blättern Sie online oder laden Sie pdf Handbuch für Water Filtration Systems Blagdon inpond 5 in 1 6000 herunter. Blagdon inpond 5 in 1 6000 18 Seiten. Clean pond machine
Auch für Blagdon inpond 5 in 1 6000: Handbuch (20 seiten)
MAINTENANCE & CLEANING
Opening and locking filter handle
Easy lift integrated locking handle
1. Handle in the locked position
3. Close handle down to open position
Foams may be cleaned vigorously in a bucket of pond water.
Adding Blagdon Bio Start after filter maintenance will help replenish these beneficial
bacterial populations and is highly recommended during the first two months of operation
when the filter is slowly being colonised.
Ceramic bio media
These will only need very occasional cleaning (once per year), but must be rinsed in pond
water to prevent damaging the beneficial bacteria which help maintain a healthy pond.
18
2. Handle is in the central position. This will enable the filter
and pump to be carried in and out of the pond. *Ensure the
filter is not carried by the pump cable.
4. The handle is in the unlocked position allowing the filter
media to be removed and cleaned.
UVC INSTALLATION
Warning - 1) Always turn off the power before any maintenance to the UVC
section 2) Always view the UVC lamp through the viewing window on the UVC
Chamber 3) Direct exposure to UVC light can damage your eyes and skin.
Caution - Inpond UVC has been fitted with a magnetic safety switch. 1) Do not
remove unit with power turned on 2) Do not place near strong magnetic fields.
UVC Lamps & quartz sleeve maintenance
The UVC lamp must be replaced every six months / once a season. It is recommended that
the lamp is replaced in the spring.
The Quartz sleeve can become coated in lime scale build up in hard water areas. This
should be carefully removed from the quartz sleeve and cleaned with a soft cloth.
A wet test must be carried out after maintenance to ensure there are no leaks before the
UVC is reconnected. pond/water feature.
Wet testing the UVC
IMPORTANT - A wet test of the UVC under operating conditions must be carried
out before the UVC or electrical supply is installed. Connect the UVC to the Inpond
following all installation instructions. After running for 24 hours check for leaks.
Testing/replacing the UVC lamp
IMPORTANT - Ensure that the mains supply is switched off and the power is isolated
before removing the UVC cover.
See Page19 for illustration
1. Unlock the green UVC electronics cap.
2. Inspect the UVC cap and Quartz sleeve for water leaks.
3. Then unlock the yellow quartz sleeve end cap and unplug the lamp to replace if
desired
19