CUBE in-a-box V2.series Detaillierte Montageanleitung - Seite 4

Blättern Sie online oder laden Sie pdf Detaillierte Montageanleitung für Inneneinrichtung CUBE in-a-box V2.series herunter. CUBE in-a-box V2.series 6 Seiten.

CUBE in-a-box V2.series Detaillierte Montageanleitung
5
6
7
8
9
10
- 2 -
Slide rail-panel 5** (hooks
facing up) on top of frame 4.
**TIP: rail-panel 5 must be
installed hooks facing up so
paper/pencil trays can hold.
Assemble the 2 wire-guides
and slide/adjust them into
posts where you will need
them, preferably under
work top level.
Adjust the brackets and
cantilevers to the mark level
(dot) on each post or at
28-1/4 inch high. Cantilever
goes on linear post C, and
brackets go on other posts.
Display brackets in corners
and on all end posts.
You just need to tighten the
big chromed- screw to
make them hold.
Display and level the 2 work
tops then screw them (you
may use an electric drill).
Use the black wood screws.
Insert each filler designed
to hide the empty space on
both posts B, as per
pictures, right and left.