Arpella LEDRD Installationshandbuch - Seite 5

Blättern Sie online oder laden Sie pdf Installationshandbuch für Körperpflegeprodukte Arpella LEDRD herunter. Arpella LEDRD 5 Seiten.

Installation Instructions
SUGGESTED TOOLS AND MATERIALS
Screwdriver
PARTS & HAREWARE INCLUDED
INSTALLATION INSTRUCTIONS
CONCRETE WALL
1
Clay Brick wall
X
1>Level the hanging cleat with a level ruler and
mark the installation hole position of the hanging
cleat with a pencil
2>Drill holes
3
Install the hanging cleat
Use 5x45mm screws to hang cleat to wall(Use at
least 5 screws).
5
Plug into the socket which is located underside
metal frame, and power cord was kept away
from the Defogger
Level
Drill
Anchor 6x
Level
1.
2.
Wall
onto the wall.
Tape Measure
Safety Glasses
Screw 6x
Level 1x
2
Insert the anchors into the wall(Use at least 5
anchors).
4
1.
Hang the mirror onto the wall.
Wall
DETAIL A
Page 3
Pencil
3.
Wall
A