Altman GALLERY SERIES Schnellstart-Handbuch - Seite 7

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Beleuchtungsanlagen Altman GALLERY SERIES herunter. Altman GALLERY SERIES 20 Seiten.

Gallery Series

Gallery Gate Installation

The provided Gallery Gate should be installed as shown in Figure 2.
Note: The Gallery Gate is only supplied and required for the 25°- 50° Short Zoom Lens and 15°- 35° Long Zoom
Lens Luminaires
To connect Gallery Gate to Gallery LED Engine:
Step 1. Unscrew the Accessory Cover Lock from the Gallery
LED Engine.
Step 2. Slide the Gallery Gate onto the Gallery LED Engine.
Step 3. Install the Accessory Cover Lock back onto the
Gallery LED Engine.
Note: The Gallery Gate needs to be installed with the Shutter
side facing the 25°- 50° Short Zoom Lens or 15°- 35° Long
Zoom Lens.

Gallery Lens Installation

The provided Gallery Lens should be installed as shown in Figure 3 and Figure 4.
Note: The 25°- 50° Short Zoom Lens and 15°- 35° Long Zoom Lens Luminaires will attach to the Gallery Gate
To connect Gallery Lens:
Step 1. Unscrew the Accessory Cover Lock from the Gallery LED Engine
Step 2. Slide the Gallery Lens onto the Gallery LED Engine
Step 3. Install the Accessory Cover Lock back onto the Gallery LED Engine
Gallery LED Engine
Gallery Gate Assembly:
GALGALT*
Gallery 25°-50° Short Zoom Lens Tube:
GAL2550LT*
Figure 3: Gallery 25°- 50° Short Zoom Lens - Overview
Accessory Cover Lock
Gallery LED Engine
Gallery Beam Wash Zoom Lens Tube:
Gallery LED Engine
Gallery Gate Assembly:
GALGALT*
Shutter x4
Figure 2: Gallery Gate - Overview
GALBWLT*
Figure 4: Gallery Beam Wash Lens - Overview
Quick Start Guide
Accessory Cover Lock
Gobo Slot Cover
Accessory Cover Lock
Page 7