Alto-Shaam 1000-MR1 Handbuch für Betrieb und Pflege - Seite 9
Blättern Sie online oder laden Sie pdf Handbuch für Betrieb und Pflege für Kühlschrank Alto-Shaam 1000-MR1 herunter. Alto-Shaam 1000-MR1 14 Seiten. Mobile refrigerated cart
Auch für Alto-Shaam 1000-MR1: Spezifikationsblatt (2 seiten), Installation, Betrieb und Wartung (17 seiten)
7.2
LOW PRESSURE CONTROL REPLACEMENT
1. Disconnect the unit from the power source.
2. Remove the control cover and disconnect the
electrical terminals.
3. Disconnect the capillary tube.
4. Remove mounting fasteners from the control
base and install a new control by reversing
the procedure.
NOTE:
The cabinet temperature
(37° to 40°F — 3° to 4°C) is regulated
by system pressure rather than actual
cabinet compartment temperature.
5. To adjust the control, attach the service
manifold to the suction. Discharge the valves
by slightly opening one-fourth to one-half
turn to all the gauges to clear.
6. Coarse-adjust the control with a standard
screwdriver by turning the adjustment
screws located on the top of the control.
Preset the cut-in and cut-out at 68-pounds
and 38-pounds, respectively.
7. Start the system. Allow the system to operate
for 5 minutes. Monitor the low-side pressure.
Fine adjustments will be required to achieve
the required cycling pressures.
NOTE:
The control adjustment process can be
accelerated by running the suction valve
in or out as required to effectively
change the pressures.
S E R V I C E
7.3 FILTER DRYER REPLACEMENT
1.
2.
3.
7.4
CHARGING THE REFRIGERATION SYSTEM
1.
2.
3.
4.
Operation and Care Manual #8410/11 • 8
Close liquid line valve and run compressor
until the low-side refrigeration gauge
indicates 0 pounds. Close suction valve.
Remove filter dryer from system and replace
with new dryer.
Purge system and add refrigerant if needed.
Connect service gauges to the suction and
discharge service valves and open valves one
full turn.
If the system is slightly pressurized, open
both manifold gauge valves and purge the
service gauge lines.
With manifold gauge valves closed, start the
refrigeration system.
Attach a drum of 134a refrigerant to the
suction service-side of the manifold gauges
and add refrigerant through the suction side
until the liquid sight glass is clear of
bubbles.
SWITCH THE CONTROL PANEL POWER
TO THE "OFF" POSITION AND
DISCONNECT THE POWER SUPPLY
CORD BEFORE SERVICING.