3form Divy SimpleSpec 200.51 Installationshandbuch - Seite 6

Blättern Sie online oder laden Sie pdf Installationshandbuch für Büroausstattung 3form Divy SimpleSpec 200.51 herunter. 3form Divy SimpleSpec 200.51 15 Seiten.

Ready To Go
SimpleSpec 200.51-Divy
Installation
1
Install Ceiling Anchor for the First Cable Assembly cont...
g
Hollow Substrate Installation
Metal
Studs
Drill Ø3/4" (19mm) hole. Minimum
clearance behind wall = 17/8" (48mm)
j
Slide the plastic cap forward along the
legs until it is seated flush to the work
surface.
For more information, please visit 3-form.com or call 800.726.0126
OCTOBER 2019 | MAN-RTG-200-51 | REV 005 © 2019 3form, Inc. All rights reserved.
h
Position the metal channel parallel
with the plastic legs. Insert the metal
channel through the drilled hole into
the wall cavity.
k
Snap the plastic legs off flush at the
plastic cap by pushing outward.
tm
Installation Manual
i
Pull the metal channel firmly against the
inner wall cavity by tugging the plastic
pull ring.
l
Note: Maximum torque on screw or rod
is 5 ft-lb.
Metal
Studs
6