3form SimpleSpec 200.60-ILTUO Installationshandbuch - Seite 5
Blättern Sie online oder laden Sie pdf Installationshandbuch für Büroausstattung 3form SimpleSpec 200.60-ILTUO herunter. 3form SimpleSpec 200.60-ILTUO 10 Seiten.
Ready To Go
SimpleSpec 200.60-ILTUO
Required Tools
Drill
Installation
1
Drill Pilot Holes (�24)
a
base plate templates (3-15-2160)
will be provided. The base plate
template has hole locations for
drilling. Spacers will also be
provided, unique to
this configuration; cut
to size based off post
dimensions in the
quoting phase.
b
Following the ILTUO Installation Template, drill pilot
holes. Use appropriate pilot hole diameter and depth for
the type of substrate you are fastening to.
*3form stocks the drill bits required for the concrete
and wood pilot holes. If you wish to purchase a drill bit,
please contact your 3form sales representative.
For more information, please visit 3-form.com or call 800.726.0126
December 2018 | mAN-rTG-200-60 | reV 002 © 2018 3form, Inc. All rights reserved.
Drill Bits
Hammer Drill
Template - Template Spacer
tm
Installation Manual
ILTUO Installation
3-15-2347
Substrate
Ø
Drill Bit
concrete
8mm
3-15-2350
Wood
3/16"
3-15-2335
ILTUO Installation
Template - Base Plate
3-15-2160
Depth
Anchors
min 4.3"
3-15-2309
min 3.5"
3-15-2310
5