Altrad BELLE PORTO SCREED Benutzerhandbuch - Seite 9
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Baumaschinen Altrad BELLE PORTO SCREED herunter. Altrad BELLE PORTO SCREED 11 Seiten.
Pre start-up inspection.
The following Pre-start-up inspection must be performed before the start of each work
3. Check the engine oil level and top up as necessary.
4. Check the engine fuel level and top up as necessary.
5. Check for fuel and oil leaks.
Honda GX120 Petrol Engine
fully to the left. If restarting a warm engine, the choke is usually not required,
However, if the engine has cooled to a degree, partial choke may be required.
3.
Turn the engine ON / OFF switch clockwise to the 'I' position.
4.
Set the throttle to the idle position by moving the throttle lever fully to the right.
handle with the other. Pull the recoil starter until engine resistance is felt, then let
starter return.
briskly.
Preparing the Porto Screed for use.
four top setscrews on the tie bars, and slide the beams out to length. Once the length has been set, tighten the four setscrews on
from the power unit and place the power unit, approximately central, onto the beams. Then reattach the clamps to the power unit
clamps are still in the correct position. The unit should now be ready for use.
are securely attached. Remove the clamp brackets from the power unit and then place the power unit, approximately central, onto
the beams. Invert the clamp brackets and reattach them to the power unit using the slotted hole on the clamp for the bolt (refer to
unit should now be ready for use.
Pre-Start Checks
Start and Stop Procedure
Preparing the Porto Screed For Use
Note:
Ensure that the power unit is securely clamped to the beams.
If using extending beams, ensure that the length of the extending beams is securely
section.
If you are in any doubt as to the setting up and use of the Porto Screed, don't
hesitate to contact your local agent or Belle Group.
9
GB
GB
Throttle Lever
Choke Lever
Fuel ON/OFF
Lever.
GB