AIMS Power PV6X250RACK Installationshandbuch - Seite 12
Blättern Sie online oder laden Sie pdf Installationshandbuch für Inverter AIMS Power PV6X250RACK herunter. AIMS Power PV6X250RACK 16 Seiten. Ground mounting system
3. Before installing the rails, mark the position of the rails on the upright. To assist installers,
the bottom rail clamps are pre-assembled in the recommended position. Adjust as required.
L=Solar Panel length.
4. Place the rails on the pre-assembled legs, adjust the rails so they are evenly aligned. Tighten
clamps to secure.
www. A imscorp.net
12