Artillian 1RMFCH Installations- und Benutzerhandbuch - Seite 3
Blättern Sie online oder laden Sie pdf Installations- und Benutzerhandbuch für Racks & Ständer Artillian 1RMFCH herunter. Artillian 1RMFCH 6 Seiten. Artillian rops mounted fuel can holder
SET-UP (cont'd.)
3. Install the adjustable length E-track cam-buckle
strap in the desired E-track slot location. Run the
strap through each of the fuel cans' handles as
shown in fig. 3.
4. Install the adjustable end of strap into the fixed
end's cam buckle and tighten strap down. Once
fully tightened, cut the excess strap (if desired)
using a pair of scissors.
CAUTION:
Remove the fuel can and bar oil from the fuel can
holder prior to the next step.
5. Once the strap is cut to length, use a heat gun or
lighter to singe the cut end of the strap to make
sure that the strap does not fray. See fig. 5.
Note: One E-track cam-buckle strap is provided in the
kit. However, the mount was designed with many E-
track and bungee cord holes to allow the user the
option to add more straps or bungee cords, as desired.
6. A U-Bolt and (4) 3/8-16 flange hex nuts are
included in this kit. These are for carrying a
sledgehammer or maul. There are a set of holes for
this U-bolt on either side of the mount and (4) holes
in the front. The front hole pattern allows for 3
possible U-bolt mounting positions. Loosely install
the U-bolt (in the desired location) and nuts per fig.
6a, then hand tighten. Per fig. 6b, install a
sledgehammer or maul into U-bolt. Make required
adjustments and tighten down the nuts. Note:
make sure that the handle for the tool clears the
rear tire and 3-point hitch arms.
Fig. 6b
(adjust U-bolt to fit sledgehammer or maul)
SET-UP
Fig. 3
(install adjustable length hold-down strap end)
Cut and singe
Fig. 5
(cut adjustable length hold-down strap end)
Fig. 6a
Hold-down strap
(install U-bolt and flange nuts for maul)
3 of 6