Artos Engineering Company CD-22 Benutzerhandbuch - Seite 7
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Industrielle Ausrüstung Artos Engineering Company CD-22 herunter. Artos Engineering Company CD-22 11 Seiten. Coiling bowls
CD-19 & CD-22 CONTROLS
Power Light
Power Switch
Break Pressure – This controls both the brake pressure and the main air on the manifold. You
want to set this gauge low enough that the bowl does not slam to a stop causing the wire to
spin and tangle up in the bowl.
Clutch Pressure – This controls how hard the bowls are pulling on the wire. There are times
that the CR machine is holding the wire tight (like during the cut and strip) so the bowl needs to
slip so the wire does not pull out of the bowl. You also want to be able to safely touch the bowl
while it is spinning and it will stop easily. Keep in mind that as you increase the clutch pressure
the brake pressure will slightly decrease, this decrease is not visible on the gauge.
The pressure for the sliding tube and bowl select cylinders comes from the main air pressure in
the CR machine.
Power Switch – ON/OFF switch. Turn CLOCKWISE to "I" symbol to turn ON and
COUNTERCLOCKWISE to "O" symbol to turn off.
Power Light – Lights up when the CR machine connected to the CD‐19 or CD‐22 power is on.
Also when the CD‐19 or CD‐22 is plugged in and the power is on.
7