Cutting Edge GL2100 Benutzerhandbuch - Seite 7
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Datenlogger Cutting Edge GL2100 herunter. Cutting Edge GL2100 18 Seiten.
3.1.3
3.1.4
3.2 Pin out Assignment and Description
3.3 The Globalstar antenna is attached by the SMA connector located at the front of the unit.
3.3.1
3.4 Cautions and Warnings
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
Page | 7
The second LED is lit when there is a pending transmission.
The external serial port is where the device receives its data. This port requires
a RS232 signal.
Ensure the antenna has a clear view of the sky.
It is important to ensure that the correct polarity is observed when powering up
the GL2100. Ensure that all power and grounds are applied only where
specified. Damage to the unit may result if power or ground is applied to the
wrong junction.
DO NOT remove factory installed screws. Damage to the units may result and
void any warranties.
DO NOT install near heat sources such as direct sunlight, warm air exhausts, or
heaters
NO scheduled maintenance is required to ensure continued functionality.
ESD (Electro Static Discharge) guidelines shall be followed.
Pin #
Board
1
Pos 4-32VDC Red
2
Neg
3
Serial Rx
4
PG2
5
Serial Tx
6
PG3
7
Output
8
PG1
Colour
Black
Yellow
Orange
White
Blue
Green
Purple