eta eHACK Betriebsanleitung - Seite 9
Blättern Sie online oder laden Sie pdf Betriebsanleitung für Boiler eta eHACK herunter. eta eHACK 20 Seiten. Flue gas recirculation
Auch für eta eHACK: Betriebsanleitung (8 seiten)
Installation
Installing the safety switch for the maintenance
cover on top
Install the maintenance cover on top of the flue duct.
Tighten the screws alternately and evenly.
Fig. 2-22: Maintenance cover
Install the safety switch with the screws only hand-tight
initially.
Fig. 2-23: Safety switch
To adjust the switch correctly, slide it upwards until it
touches the pin.
Fig. 2-24: Pin
Then slide the switch a further 2 - 3 mm towards the
pin, so that the switch is actuated and a "click" is
clearly audible.
Fig. 2-25: Switch set correctly
Now carefully tighten the fixing screws of the
safety switch. Do not fasten them too tightly,
because otherwise the switch is strained and does not
trigger correctly.
Installing the safety switch for the maintenance
cover of the de-ashing
Install the maintenance cover for the de-ashing on the
bottom. Tighten the screws alternately and evenly.
Fig. 2-26: Maintenance cover
9