ASGCO BC-2 Anleitung für Installation, Betrieb und Wartung - Seite 8
Blättern Sie online oder laden Sie pdf Anleitung für Installation, Betrieb und Wartung für Industrielle Ausrüstung ASGCO BC-2 herunter. ASGCO BC-2 9 Seiten. With bolt-up tensioner system
BC-2™ MAINTENANCE
AFTER ONE DAY OF OPERATION
Inspect the cleaner for proper belt cleaning and operation.
WEEKLY
1.
Frequent inspection is the key to proper belt cleaning and easy Scraper servicing. Weekly inspec-
tions are recommended, but actual service frequency may vary widely depending on various plant
operating conditions.
2. Wash the entire cleaner regularly to prevent excessive buildup. If material tends to accumulate on
the Scraper Assembly then possible scraper relocation may be in order.
3. Carefully inspect the wear tips of the cleaner blades. Make sure blades are not chipped or worn
out. (Replace when necessary)
4. Inspect the belt surfaces and edges for cracks, splits, tears, holes or any other worn or damaged
condition occurring on the surfaces or edges of the belt itself. If necessary make repairs to the belt.
REPLACEMENT AND RE-TENSIONING OF CLEANER BLADES
1.
Lower mounting tube to disengage the cleaner blades from the belt.
2. Remove the clamp block to remove the tube from the mounting brackets.
3. Loosen and remove the nuts holding the blades onto the arms.
4. Remove the worn blades and discard.
5. Position new blades on the arms and reinstall the nuts and bolts to hold the blades evenly across
the cleaner edge.
6. Reinstall mounting tube with blades in place and tension according to directions
www.asgco.com
800.344.4000
6
|