Cypress CY8CKIT-029 PSoC Schnellstart-Handbuch

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Computer Hardware Cypress CY8CKIT-029 PSoC herunter. Cypress CY8CKIT-029 PSoC 2 Seiten. Psoc lcd segment drive expansion board kit

Cypress CY8CKIT-029 PSoC Schnellstart-Handbuch
PS
O
1
Board Setup
1. Plug the expansion board into port A of
the CY8CKIT-001 DVK and connect the
MiniProg3 to the PSoC 3 processor
module.
2. Connect the jumper wire from port VR to
port P0_2 on the CY8CKIT-001 DVK.
3. Plug 12-V adaptor into the power jack
of the CY8CKIT-001 DVK; plug the other
end to a wall outlet to power the DVK.
3
Install Software
1. Insert the kit CD and install kit
software.
2. Open the kit guide for additional
documentation, projects, and demos.
®
C
LCD SEGMENT DRIVE EXPANSION BOARD KIT
QUICK START GUIDE
2
Jumper Settings
1. The remaining jumper settings on the
CY8CKIT-001 DVK should be left in the
default state. Refer to the "PSoC
Development Kit Board Guide" for
default jumper settings.
2. Power on the VR by setting jumper J11
to ON position on CY8CKIT-001 DVK.
4
Test Board
1. Program the PSoC 3 device on the
CY8CKIT-001 DVK board with the
"Battery Meter" example project.
2. Vary the VR (potentiometer) and observe
the status changes displayed on the LCD.