cytiva AKTA start Maintenance Card - Seite 2

Blättern Sie online oder laden Sie pdf Maintenance Card für Laborausrüstung cytiva AKTA start herunter. cytiva AKTA start 14 Seiten.

cytiva AKTA start Maintenance Card

Flow path overview

The illustration below shows the flow path for ÄKTA
start.
Part
Description
1
Buffer valve
2
Mixer
3
Sample valve
4
Pump
Regular
maintenance
Regular maintenance is important for safe and
trouble-free operation of ÄKTA start. The user
should perform maintenance on a daily, weekly and
monthly basis.
Periodic maintenance schedule
The periodic maintenance schedule provides a
guide to the user to ensure proper maintenance of
the ÄKTA start and Frac30.
2
Part
Description
5
Pressure sensor
6
Wash valve
7
Injection valve (manual)
8
Column
Part
9
10
11
12
Interval
Maintenance action
Visually inspect the instrument for
Daily
leakages in the flow path.
If there are signs of liquid leaking,
check integrity of tubing and tubing
connections.
Clean the column and flow path after
use and leave the system filled with
DM water.
Note: If the instrument is not going to be
used for 1-2 days, prepare the system for
storage.
Note: Open the pump cover after
switching off the instrument.
ÄKTA start Maintenance Cue Card, 29024043 AF
Description
UV Monitor
Conductivity Monitor
Outlet valve
Fraction collector