Blueridge BM12MCC Installationshandbuch - Seite 16

Blättern Sie online oder laden Sie pdf Installationshandbuch für Fan Blueridge BM12MCC herunter. Blueridge BM12MCC 18 Seiten. Ceiling cassette indoor air handler

Blueridge BM12MCC Installationshandbuch
Electrical Wiring
CAUTION
All field wiring and components must be installed by a licensed electrician and must comply with
relevant European and national regulations.
Use copper wire only.
Follow the 'Wiring diagram' attached to the unit body to wire the outdoor unit, indoor units and
the remote controller.
A circuit breaker capable of shutting down power supply to the entire system must be installed.
Note that the operation will restart automatically if the main power supply is turned off and then
turned back on again.
Be sure to ground the air conditioner.
DO NOT connect the ground wire to gas pipes, water pipes, lightning rods, or telephone ground
wires.
Gas pipes: might cause explosions or fire if gas leaks.
Water pipes: no grounding effect if hard vinyl piping is used.
Telephone ground wires or lightning rods: might cause abnormally high electric potential in the
ground during lightning storms.
How to connect wiring
Remove the control box lid of the
indoor unit.
Remove the cover of the outdoor unit.
Follow the "Wiring diagram label"
attached to the indoor unit's control
box lid to wire the outdoor unit, indoor
unit and the remote control. Securely
fix the wires with a field supplied
champ.
Attach the cover of the outdoor unit.
Model
Phase
12K~18K
1Phase
 Page 16 
Power
Frequency
Circuit breaker/
and volt
Fuse(A)
208-240V
20/16
3
4
5
6
7
7
1
2
1 Control box lid
2 Wiring diagram label
3 Power supply terminal block
4 Clamp for wiring
5 Wiring between units
6 Plastic cover
7 Clamp (field supply)
Fig 7.1
Revised 5/14/2020