Bluerock Tools SL-1.25 Betriebshandbuch - Seite 13

Blättern Sie online oder laden Sie pdf Betriebshandbuch für Elektrowerkzeug Bluerock Tools SL-1.25 herunter. Bluerock Tools SL-1.25 18 Seiten. Seam locker

Bluerock Tools SL-1.25 Betriebshandbuch
S L - 1 . 2 5
S E A M
L O C K E R
o

TRANSPORTING THE MACHINE

Ø
When transporting the machine, always carry by the machine main handle.
Ø
If transporting inside a vehicle, it is recommended to transport it on its side so as to avoid the item falling
over.
Ø
DO NOT carry the machine by the cord.
Ø
DO NOT allow the cord or plug to drag along the floor when transporting.
2) Move lever into position against the channel with the lever in the open
position (away from the direction of feed)
3) Set the machine up against the prepared material on the channel.
4) Move lever in direction of the feed (tool in working position towards the end
of the end of the channel).
5) Switch machine on.
6) The machine is drawn through the channel as the driving rollers feed the
machine over the material while locking the seam.
7) Lock seam on channel.
8) Move lever into open position (away from feed direction)
9) Switch machine off and remove from material.
NOTE: Some amount of refinishing must be carried our manually at the end of the channel. This
is usually 130mm of manual work.
10