Ambirad ARO Series Installations- und Betriebshandbuch - Seite 10
Blättern Sie online oder laden Sie pdf Installations- und Betriebshandbuch für Heizgerät Ambirad ARO Series herunter. Ambirad ARO Series 16 Seiten. Oil fired tube heater
Burner start up procedure
Turn on the oil supply, connect electrical
supply. Ensure that the thermostat and
time clock are calling for heat. Bleed the
air through the pump by slackening the
oil pump plug.
Note Where a deaerator is used, release
the air through knurled nut on the top of
the deaerator.
During this purging sequence the burner
may go to lock out.
Depress lockout reset.
Once the air is purged, retighten the oil
pump plug.
Check air regulator is set to 4.5.
If adjustment is required see Figure 11.
8
Observe start up sequence;
• 1 Fan runs
• 2 Spark ignition is energized
• 3 Oil solenoids open
• 4 Ignition successful
If ignition fails air may still be present
within the system. Purge the air as
necessary. Depress lockout reset to
restart ignition sequence.
Turn off electrical supply and attach the
oil pressure gauge to pressure gauge
port on pump firstly removing oil pump
plug.
Reconnect the electrical supply. Check
the oil is set to 130psi (9bar) if necessary
adjust at oil pump with a suitable allen
key.
-
+
Run the burner for a minimum of 15
minutes, then check the combustion
products in the flue with a suitable gas
analyser adjust air regulator to give CO2
of 10-10.5% and a smoke No. 0.
Figure 11 Air regulation
To adjust air flow, loosen the two
screws 'B' and turn the air damper
as required.
Re-tighten the screws 'B' .