Flo Fab 2FFSE411A Manual de instalación, uso y mantenimiento - Página 6

Navegue en línea o descargue pdf Manual de instalación, uso y mantenimiento para Bomba de agua Flo Fab 2FFSE411A. Flo Fab 2FFSE411A 12 páginas. Submersible non-clog sewage pumps

If oil is found to be clean and
uncontaminated
above 15 kV breakdown), re ll the
housing.
If oil is found to be dirty or
contaminated (or measures below
15 kV breakdown), the pump
must be carefully inspected for
leaks at the shaft seal, cable
assembly, square ring and pipe
plug, before re lling with oil. To
locate
the
leak,
pressure test.
After leak is repaired, dispose of old
oil properly, and re ll with new oil.
Pressure Test (If oil has been
drained) - Remove pipe plug from
housing. Apply pipe sealant to
pressure gauge assembly and tighten
into hole. Pressurize motor housing
to 10 PSI. Use soap solution around
the sealed areas and inspect joints for
"air bubbles".
If, after ve minutes, the pressure is
still
holding
constant,
"bubbles" are observed, slowly bleed
the pressure and remove the gauge
assembly. Replace oil. Leek must be
located and repaired if pressure does
not hold.
Pressure Test (If oil has NOT been
drained) - Oil should be at normal
level. Remove pipe plug (20) from
housing (4). Apply pipe sealant to
pressure gauge assembly and tighten
into hole. Pressurize motor housing
to 10 PSI. Use soap solution around
the sealed areas above the oil level
and inspect joints for "air bubbles".
For sealed areas below oil level, leeks
will seep oil. If, after ve minutes, the
pressure is still holding constant, and
no
"bubbles",
oil
observed, slowly bleed the pressure
and remove the gauge assembly.
Replace oil. Leek must be located and
repaired if pressure does not hold.
(measuring
perform
a
Oil Replacement - Set unit upright
and re ll with new cooling oil as per
table below. Fill to just above motor,
and
no
but below capacitor as an air space
must remain in the top of the
housing to compensate for oil
expansion.
compound to threads of pipe plug
(20) then assemble to housing (4).
Over lling oil voids warranty.
Recommended Supplier/Grade
seepage
is
BP
Conoco
Mobile
Shell Canada
Texaco
Figure 4
Pressure builds up extremely
fast, increase pressure by
"TAPPING" air nozzle. Too
much pressure will damage
seal. DO NOT exceed 10 PSI.
Apply
pipe
thread
DO
NOT
over ll
Over lling of housing with oil
can create excessive and
dangerous hydraulic pressure
which can destroy the pump
and create a hazard.
Cooling Oil
Enerpar SE100
Pale Para n 22
D.T.E. Oil Light
Transformer-10
Diala-Oil-AX
Disassembly
Impeller, V-ring and Volute:
1. Disconnect power.
2.
Remove
lockwashers, vertically lift motor
housing and seal plate assembly from
volute. Clean out volute if necessary.
3. Inspect gasket and replace if cut or
damaged.
4. Clean and examine impeller, for
cracks or breakage and replace if
required.
To
remove
place a at screwdriver in the slot of
the end of the shaft to hold the shaft
stationary while unscrewing the
impeller.
5. Check v-ring and remove if
damaged.
Power Cord and Motor:
6. Remove pipe plug and drain oil
from housing.
7. Remove gland nut, washer and
ring from housing. Pull cord through
and disconnect the wires from the
terminals on power cord.
8. Remove screws and lift motor
oil.
housing and stator from seal plate.
9. Remove v-ring, replace if damaged.
10. Check motor capacitor with an
Ohm meter by rst grounding the
capacitor by placing a screwdriver
across both terminals and then
removing screwdriver. Connect Ohm
meter (set on high scale) to terminals.
If needle moves to in nity (∞) then
drifts back, the capacitor is good. If
needle does not move or moves to
in nity (∞) and does not drift back,
replace capacitor.
Service
capscrews
and
impeller,
05