Amcot LRC-LNS Manual de uso y mantenimiento - Página 5
Navegue en línea o descargue pdf Manual de uso y mantenimiento para Accesorios Amcot LRC-LNS. Amcot LRC-LNS 9 páginas. Cross flow cooling tower
4.
Preparations Before Operations
4.1 Irrelevant objects by the air inlet or surrounding the fan stack should be removed.
4.2 Be sure that Fan blade will not make contact with Fan stack so as to avoid damage to tower.
4.3 Check to see if the V-Belts of Speed Reducer are properly adjusted.
4.4 V-Belts have to be positioned on the same level.
4.5 After the above checks have been made, switch the fan motor on and off intermittently to see
if the fan revolves correctly. At this time you can also check for any abstract noises or
vibrations.
4.6 Clean dust and dirt from inside the cold water basin and then fill basin to the overflow level.
4.7 Remove all foreign objects and materials from the Hot water dis tribution pans on top of
cooling tower.
4.8 Turn Centrifugal Pump on and off intermittently to remove air from pipes and allow water to
fill the system.
4.9 When the pump is in normal operation water level will decrease depending on length of run
and actually flow rates required. Float Valve should be adjusted at this point to ensure design
AMCOT COOLING TOWER CORPORATION OPERATIONS AND MAINTAINENCE MANUAL IS
OWNED BY LIANG CHI (USA) CORPORATION. THE NAME "AMCOT" AND AMCOT PRODUCT
LOGO ARE TRADEMARKS AND ANY REPRODUCTION WITHOUT WRITTEN CONSENT WILL
BE A VIOLATION OF LAW AND SUBJECT TO LEGAL ACTIONS. ALL RIGHTS RESERVED, 1998.