D2G gravitee GK-2009 Manual - Página 9
Navegue en línea o descargue pdf Manual para Monitor D2G gravitee GK-2009. D2G gravitee GK-2009 9 páginas. 10' x 20' display
© 2023
Order #XXXXX
Top View
Back View
SEG Graphic Installation
Corner A
Corner B
Corner D
Corner C
It is important to first insert
Step 1
Step 2
Insert corner A. Turn edge of
Repeat Step 1 for opposite
graphic into each alternate
graphic so silicon welt is
corner C, then insert corner
corner then to the sides of
perpendicular to face of
B, followed by corner D, to
the frame. If this is not done,
graphic. Insert narrow side
complete the installation of
graphic will not fit into the
of welt with fabric to outside
the corners.
frame correctly.
into the channel. Repeat for
other side of this corner.
GOD-1560 Counter Assembly (cont'd)
Steps:
1) Wrap
SEG Graphic
2) Attach
Shelf Supports
3) Place
Counter Top
i c
r a p h
S E G G
Front View
Graphic Removal
To remove the graphic from
Step 3
the frame, locate the fabric
Once all corners are inserted,
pull tab. Gently pull up on
press one silicon edge into
the tab to remove the fabric.
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
around front & sides of Counter, as shown.
using Velcro; place Internal Shelf.
on top of assembly & secure in place.
Counter Top
Shelf
Shelf Supports
attach with
Velcro
When assembled
*
Counter Top Attachment
1
Rotate pin. Spring
Align hole with pin.
will push pin into hole.
Shelf Supports
attach with
Velcro
2
Step 5 of 5