Da-Lite Fast-Fold Libro de instrucciones - Página 3
Navegue en línea o descargue pdf Libro de instrucciones para Accesorios para proyectores Da-Lite Fast-Fold. Da-Lite Fast-Fold 8 páginas. Truss frame
También para Da-Lite Fast-Fold: Manual de instrucciones de montaje (16 páginas), Libro de instrucciones (4 páginas)
Procedure
3. While holding the bottom of the frame in place, lift the top
of the frame to unfold the sides. Lock down all four
corner braces.
4. Lay the frame on the floor.
5. Match top of screen surface (labeled TOP) with top of frame.
6. Snap all four corners.
7. Starting at the bottom section, snap the center button.
Continue snapping the remaining buttons.
8. Snap the top and sides in the same manner.
9. Attach Leg to each side of frame using at least 2 Speedy
Cranks per leg. NOTE: Speedy Crank at bottom of leg should
be on side of leg away from screen. Do not tighten Speedy
Cranks until all are started.
Screens under 10' in height will include
6 Speedy Cranks (3 per leg).
Screens 10' in height and over will include
8 Speedy Cranks (4 per leg).
Any screen ordered with optional HD Legs will include
10 Speedy Cranks (5 per leg).
10. Height Adjustment. Fast-Fold® Deluxe screen height is
adjustable in 6" increments either up or down. Normal
screen height is 44" from bottom of frame to floor and
is the standard height for use with presentation
drapery accessories.
NOTE: Do not extend frame so that more than half
of the frame height is above the top of the legs.
Blue Snap Latch Button
11. To fold frame, unlock all four corner braces. Push
the blue snap latch buttons and fold the frame.
NOTE: for some frames fold the top and bottom first.
Snap Latch
Lock Down
The Corners
Speedy
Crank
Top
Snap Latch
Leg
Frame
Frame
Spacer
3