DoorKing 9150 Series Manual - Página 3
Navegue en línea o descargue pdf Manual para Abrepuertas DoorKing 9150 Series. DoorKing 9150 Series 5 páginas. High voltage kit
También para DoorKing 9150 Series: Inicio rápido (2 páginas)
Model 6300
Installation for a 115 VAC 6300 primary operator ONLY.
Mount step-down transformer on the 4 existing threaded studs using the (4)
Step 1:
four nuts supplied with this kit.
Wire the step-down transformer for the desired input voltage (see first page).
Step 2:
Primary
6300
ONLY
Model 9000
Installation for a 115 VAC 9000 primary operator ONLY.
Bolt step-down transformer in position shown using the (4) four nuts and bolts supplied with this kit.
Step 1:
Wire the step-down transformer for the desired input voltage (see first page).
Step 2:
Important Notes:
Dual Gate Operators Installation:
step-down transformer and AC input power wire is only required for the
PRIMARY gate operator. Reduce the AC input power wire run max distance
by ONE-HALF.
"Optional" Heater Installation:
voltage AC power wire size and distance limitations" table on the
instruction sheet with the heater kit for AC input power wire run limitations.
Operator MUST be
properly grounded.
Keep wires away
from moving parts.
Variable Input Power
(see first page)
DANGER
HIGH VOLTAGE!
2600-267-G-6-16
When installing on bi-parting gates, a
When installing a heater, refer to the "high
115 VAC
Power Terminal
Neu
Hot
White
Black
115 VAC Output
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Important Notes:
Dual Gate Operators Installation:
a step-down transformer and AC input power wire is only required for
the PRIMARY gate operator. Reduce the AC input power wire run max
distance by ONE-HALF.
"Optional" Heater Installation:
"high voltage AC power wire size and distance limitations" table on
the instruction sheet with the heater kit for AC input power wire run
limitations.
Step-Down Transformer
Mounting Position
Power Terminal
Variable Input Power
(see first page)
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Primary
9000
ONLY
Step-Down
Transformer
Mounting
Position
When installing on bi-parting gates,
When installing a heater, refer to the
115 VAC
Power Terminal
Operator MUST be
properly grounded.
Chassis
Neu
Hot
Ground
Keep wires away
from moving parts.
White
Black
115 VAC Output
DANGER
HIGH VOLTAGE!
r
w e
P o
Power
Terminal